Last weekend I noticed that the floor around our shower was 'squishy'. We waited till this past weekend to investigate it... Turns out to be a HUGE mess!!! In order to get to the flooring around/under the shower we had to take the glass door off, rip the plastic shower walls off, and then we could pull up the bottom of the shower. The plastic walls were not salvageable after pulling them off. When we first decided to buy this house I knew I eventually wanted to expand our shower and make it more of a walk-in shower. But right NOW was not in our budget time frame. This will probably be a very drawn out process, but in the end I will be happy with my new shower. Fortunately we have another shower, but I hate having to walk from the other side of the house to take a shower. Here is what it looks like so far...
Hubby ripping off the walls and starting the floor. Makes me mad to see that ugly wallpaper again. I had finally finished painting this bathroom in hopes of never seeing those ugly flower design ever again.
Hubby and KFC taking 'showers' in the kitchen! :) Notice how KFC copied her Daddy with the armpit washing and butt washing! Haha
Here is what we found under the shower floor... Gross, Nasty, Smelly mildew/molded flooring! The insulation under the flooring was even wet. Just a big ole mess! Also in the corner where the shower floor had a slight upwards grade to allow water to run to drain, there was a mouse's nest! Hubby said when he was cleaning the insulation out that was sub-floor he found, to be expected, mouse droppings, but also SNAKE SKIN!!! Needless to say we have filled all holes while we wait for the process to proceed!
After pulling up the linoleum floor we could see that it reached far more that I expected it to be. It had gone under that 'fake' wall as well as starting to go up the Sheetrock. The wall had to go too! Hubby had to tear the linoleum up to get far enough out to replace the flooring. That means, we will now need new linoleum for the entire bathroom.
Old sub-floor cut out and all icky wet insulation removed (insulation not yet out in picture). Hubby has replaced the sub-floor and filled in all cracks with foamy stuff. Next is to design what will be the new shower.
What I would like to do is take that whole area, from the right side of the picture where the wall starts over to the other wall where old shower was, and tile it all. We would build another fake wall to give the shower another side but leave an opening for the doorway near the wall that on the right. That way its like a walk-in/ hallway of a shower. We will move the shower head from off the 'fake' wall where it used to be, to having the shower head come from the ceiling. We will also need a light in there too. I had no idea it would require this much effort to fix a 'little' leak! If anyone has any cool ideas on the design or tiling let me know! Kinda going back and forth on a few ideas.